DM electric motorcycle parts hub motor

FOB Reference Price:Get Latest Price
US $55-100 / Pieces | 50 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Voltage:
48v-96v
Design:
Brushless
Wattage:
> 400w
Part::
Motor
Brake type::
drum brake
Speed::
450R-650R
Wheel Material::
Iron
Assembly opening::
200
Stator Height::
30H-40H
Specifications::
12"motor
Supply Ability
Supply Ability:
1000 Piece/Pieces per Day
Packaging & Delivery
Packaging Details
2 pieces in a box
Port
NINGBO
Lead Time :
within 20 days after receiving deposit
Product Description

        12 inch DM electric motorcycle parts hub motor 

IMG_20170809_110011.jpg

Technical Parameters:  

Model12"motor
MotorBrushless
Voltage48-96V
Power800W-1500W
Speed400R-650R

 

Features:                                                     

High cost performance, high torque, strong overload capacity, low temperature rise, with threaded head.

COMPANY SUPERIORITY:

 

1.We are experience in exporting and international trade.

2.We are knowledge in market demands and product satisfaction.

3.We are professional in production team and control system.

4.We are sincere and honest to customers.

 

Company Information

 photobank (39) (1).jpgQQ20170727133318.png4.png1.jpgphotobank (3).jpg

photobank (6).jpg

 

Packaging & Shipping

 

PACKAGE:

Standard export carton packing.

DELIVERY TIME:

According to different quantity of order, generally the order cycle needs 20 days after the order confirmed by both parties.

 PAMENT:

1489018848(1).jpg

 

FAQ

 

1. Are you a factory or trading company ?

   ==  We are a factory, welcome to visit us when you are convenient or business journey in China.

2. Where is your factory located ? How can I visit there ?

   ==  We are at Wenling City, about 6 hours driving from Shanghai, we can arrange to pick up you.

3. What certificates do your products have ?

   ==  CE,CCC &ISO:2008

4. Can you supply sample for testing market?

   ==  Yes, we as a professional manufacturer, sample and small orders are acceptable.

5. Delivery time for sample order?

   ==  10 days depends on whether it has in stock.

6. Delivery time for buck order ?

   ==  40--50days according to your order quantity and models.

7. Payment terms?

    ==  T/T , L/C at sight, Payable.

8 . Mix different models in one container?

    ==  It's ok, we will calculate the space and give suggestions.

9. How does your factory to regarding the quality control?

    ==   Quality is the first important, We always attach great importance to quality control from every beginning to  the end of the production. Every product will be full assembled and carefully tested before packing and shipping.

Welcome to contact with us.

Whatsapp:+8613575873725

card1.png